Intrawest Employee Services Building

Whistler/Blackcomb, Canada

BACKGROUND
The employee services building was designed right into the side of the mountain next to the Westin Hotel, which also utilized KIM. Substantial mountain run-off was expected to be a problem.

SOLUTION
In the summer of 1998, in very hot 33°C temperatures, the foundation walls were poured over 3 meters in height. Both the KIM admixture and the Krystol Waterstop Joint Design were installed in the walls and the suspended slab as the sole waterproofing system replacing membrane requirements. To date the system is performing as specified.

Product Krystol Waterstop Joint Design System: Krystol Waterstop Slurry, Krystol Waterstop Grout
Location Whistler / Blackcomb, BC, Canada
Owner Intrawest Developments
General Contractor Amako Resort Construction
Ready-Mix Supplier Cardinal Concrete

Back to Top



3 meter tall KIM concrete walls were constructed into the side of the mountain to withstand significant mountain run-off