21 Sep 1983
The Boeing Everett Factory is the world's largest volume building under a single roof, measuring in at over62-acres indoors. Located in Everett, Washington, the sheer magnitude of the center expressed Boeingto the world and become an icon in the aviation industry. The original facility was designed, engineered,and constructed in 1967 and was already the largest building by volume in the world. In 1983, Boeingexpanded in order to produce 777s, which meant further construction to an already unique building.
The below grade foundation required very thick concrete pours at 6 ft. thick at the base, tapering to4.5 ft. (1.38 m) thick at the top. There were 6,500 ft. (1,981 m) of tunnels to accommodate utilitymains and designed for emergency evacuation, and 11,500 ft. (3,505 m) of trenches to facilitate utilityinstallation. At the time, sheet membranes had an average life expectancy of only five years, whichwould mean Boeing would have had to do replacements or repairs six times since 1983.
Instead of using sheet membranes, the construction team went with Kryton's Krystol InternalMembrane™ (KIM®) admixture to completely tank the massive building. KIM was able tomake the concrete the waterproof barrier and replace any need for an external membrane or otherwaterproofing method.
Kryton provided the Boeing Aircraft Company with a standard 25-year warranty. Thirty-one yearslater and the system continues to perform perfectly to specification, effectively saving The BoeingCompany a lot of time and money in the process.