Gera 77 is a commercial building in Pune, (Maharashtra,) India, that required waterproofing in its basement parking facility. There was a large quantity of water seeping through the retaining walls while some points had active leaking. Water was accumulating in the basement and required continuous pumping. The main cause was active leakage sources in the ramp areas and even some areas on the floor level. The developer had provided drains for the main area of leakage and was pumping out water every 15 minutes. The floor area also had active sources under the PCC cover. All the walls were covered with thick plaster. If the water was not pumped out, it would accumulate up to 0.5 meters (1.5 feet) on the basement floor within 45 minutes.
Kryton Buildmat and its regional applicator offered the following advice:
The fifteen centimeter (six-inch) thick plaster surface was removed from the basement’s retaining walls. Removing the plaster revealed a polymer coating underneath. Kryton’s applicator removed the existing polymer coating by hacking the plaster with grinding machines. This resulted in a rough finished appearance. The applicator then prepared the surface for coatings of Krystol T1 and T2 by soaking all the walls for four days (SSD situation). At this point, the developer noticed water had started opening new areas of active leakage and seeping in through new places. One coat of Krystol T1 at 0.8 kg/square meter was applied on the walls followed by second coat of Krystol T2 at 0.8 kg/square meter. The walls were regularly cured by sprinkling water. Curing continued for three days. After three days only the active points were flowing. The minimal seepage had diminished or completely stopped. The team continued curing for the next seven days and achieved a total end to water seepage. The next step was to waterproof the floor by removing the PCC layer and waterproofing the concrete. The coves along the columns were treated with Krystol Baricote and the entire floor was treated with Krystol T1 at 0.8 kg/square meter then a second coat with Krystol T2 at 0.8kg/square meter. After treating the entire basement, all the active sources were treated with the Krystol Crack Repair System. After approximately 20 days, our applicator achieved the desired results. The crystal growth within the concrete had completely stopped the water and finished drying the surfaces. As a precaution, we also watched for water leakages during the monsoon rains and confirmed the entire basement remained dry.