Watch our webinar: Advanced Strategies for Integral Waterproofing Concrete in Modern Building Envelopes - Watch Now
Background The Palm Islands are the three largest man-made islands in the world. Construction on the “Eighth Wonder of the World” began in May, 2002 off the coast of Dubai. It is expected to be one of the world’s top tourist destinations. Each of the islands (Palm Jumeirah, Palm Jebel Ali, and Palm Deira) are … Read More
Background Office building complex situated along the Thames River, next to the Tower of London. The underground tunnels were constructed with precast pipes and cast in place concrete using conventional waterproofing systems. Hundreds of leaks occurred through cracks and joint locations where rubber gaskets were failing. Leaking cracks reached lengths of five feet (1.5 meter), … Read More
Background At the construction site of Croatia Osiguranje, the underground water level was very high. The pumps were working at all times during the construction phase of the underground garage which measured 2 x 2600 meters squared. Solution By using Kryton’s Krystol Waterproofing System, the entire underground garage was protected from intruding water. Based on … Read More
Background Krystol Internal Membrane (KIM) was used in the concrete mix of the the 200 cubic meters deck slab on the rooftop car park of the BMW Building in Southbank, Melbourne. Solution KIM is a cementitious admixture added to the concrete to provide permanent self-sealing waterproofing. KIM uses Kryton’s proprietary crystalline technology to react with … Read More
Background A 3,250 square meter (35,000 square foot) parking deck raft slab required waterproofing and corrosion resistance. The raft slab was on grade but the property is situated below sea level. Engineers were concerned about wicking water and subsequent corrosion of reinforcing steel. As well there were virtually no joints or construction breaks to alleviate stress and … Read More